Posts Tagged 'septic tank system'

Aug
4
2011

In the previous blog, I discussed the building sewer, which is essentially the piping that carries waste from a building to a waste treatment system. Picking up where the building sewer terminates, we will discuss in more detail the next component: the septic tank.

Aug
3
2011

Typically, construction of a new septic tank system starts at the house by installing a building sewer, then installing a septic tank and, finally, installing whatever wastewater distribution component (i.e. drain field) is necessary for the local codes, site and soil conditions.